
Join us on May 20th! Grand Opening!
ILLINOIS GRAND OPENING! MAY 20, 2015 This ONE-day event is jam-packed with live demonstrations and the latest CIPP technology! Register: info@perma-liner.com or 1-866-336-2568 DEMONSTRATIONS: Continuous

ILLINOIS GRAND OPENING! MAY 20, 2015 This ONE-day event is jam-packed with live demonstrations and the latest CIPP technology! Register: info@perma-liner.com or 1-866-336-2568 DEMONSTRATIONS: Continuous

Got Profit? Zero Down. No Payments for 90-Days. Package Includes 600 FT of Liner Materials (Liner, Calibration Tube, Pull Tape and Epoxy Resins) VISIT OUR

Check out the schedule below and call 1-866-336-2568 to reserve your spot! ONE-ON-ONE TIME WITH FIELD TECHNICIANS, DEMONSTRATIONS: Perma-LateralTM Lining with Steam Cure, Sectional Point

The Perma-Lateral ™ lining system was developed in 1999 and remains the trusted brand in small diameter pipe lining. The Perma-Lateral ™ system is designed for

Thank you for visiting our live demos at the 2015 WWETT Show in Indianapolis! If you missed any of the Perma-Liner™ live demonstrations, or have further

Come visit us at WWETT 2015!! We are currently at booth #3223 at the Indiana Convention Center! WWETT is the Water & Wastewater Equipment, Treatment

Perma-Liner™ (PLI) is the leading manufacturer and supplier of trenchless pipeline rehabilitation equipment & materials in North America. Since 1999, PLI has developed systems to

Perma-Liner is holding on last Open house to close out 2014. That’s right Los Angeles, on December 9-11, 2014 here in sunny Clearwater, Florida! We

Los Angeles, we may be in for a swarm of earthquakes coming our way. The activity was picked up in Nevada and was moving swiftly

Several thunderstorms wreaked havoc in parts of the mountains and Desert of San Bernardino County on Sunday, clogging key access roads with rocks and mud,